Half-pack repair is over, what items should be checked?

thumbnail

The first batch of owners who started construction after the year has recently started to deliver work one after another. We are doing half-package construction. Let me tell you what items should be checked when handing over half-package construction?

After the half-package repair is completed, there is not much change in the house. It is nothing more than laying tiles on the ground, painting the walls with latex paint, and making the ceiling. It looks good or not.

This is not as easy to produce effects after the main material is installed, such as making a TV background wall or installing a cabinet. This effect has a better impact than half-pack completion.

Even so, after the half-package is completed, some inspection items are required. After all, the later construction and the earlier stage have been separated, which involves the division of responsibilities.

I said 5 points are more important, for your reference.

The first point is to check the pressure of the floor heating. If you have a pressure gauge on the floor heating water separator in your home, it will be easier to check. Take a look. As long as there is no obvious change in the pressure after the completion and before the completion, there is no problem. It proves that the floor heating is a It is safe, so that if there is a problem during the installation later, it has nothing to do with the half package. If there is no pressure gauge on the water separator, you need to find someone to pressure test.

The second point is to check the function of all sockets and lamps in the house. It is relatively simple to check the lights, just turn the switch on and off a few times and try it. Check to see if the multi-control switch is wired correctly. The inspection of sockets is the key point. Find a socket with an indicator light and try one by one to ensure that all sockets are powered.

The third point is to check whether the floor tiles are bumped or scratched. There is no good way to do this. You can only look at the ground with your eyes.

The fourth point is to check whether there are water and electricity signs on the wall tiles of the bathroom and kitchen. This will be of great help for the later installation of the bathroom and cabinets, and avoid hitting the water pipes or electric pipes.

The fifth point is to let the other party remove all the decoration garbage on the site, and do not leave any leftovers. It has been proved by a large number of construction sites that if there is a little garbage on the site, when the main materials are installed in the later stage, other masters will put the garbage in the house by default. Where there is garbage, it is a very troublesome problem to finally clean up the garbage, and it is very likely that the owner will eventually pay the bill.

In addition to these 5 points, I didn’t talk about the problem of the wall, because in the later construction process, the wall will inevitably be damaged, and the wall area of ​​the home is the largest, some problems are not yours You can see it once you look at it. It is possible that when you go there, you will find different problems from different angles.

You can summarize the wall problems. After the house is all decorated, let the master oiler come over and fix it together.

The 5 points just mentioned are more important. The owner of the semi-package repair can follow the 5 steps just mentioned to check item by item. It will be troublesome in the early stage. If there is a problem in the later stage, it can be explained clearly. Disguised to save the owner money.