Owners often ask which is better for steel structure and pouring? Are their prices too big? Talk to you today.

First of all, there is no difference between steel structure and pouring, depending on your own needs.

Generally, if the area is relatively large at home, it is recommended to do pouring, because there will be no abnormal noise in the later stage of pouring, and the thickness of the floor to be poured is relatively small. Therefore, it is very cost-effective to pour a home that uses an inch of land and a lot of money.

The steel structure is suitable for use in spaces outside the home, such as offices and warehouses, where the space is relatively high and you want to use it on multiple levels.

Because these spaces are only for office, storage, and no living requirements.

Focus on the price of the two.

The price of pouring consists of two parts, the first is the main board, and the second is the auxiliary beam or column.

In our home, a single area exceeds 20 square meters, and there must be beams in some places. Similarly, when we pour a new floor, if the area is too large and the span is too long, it needs to be supported by beams, and the beams need to fall on both sides. on a concrete wall or column.

If you ask the pouring business, how much does your house cost per square meter? It is wrong to tell you 500, 600 or 800. If you want to get an accurate price, you need to have construction drawings or let the construction party come to the site to see and then quote.

Let’s talk about our local quotation. Owners in need can use it as a reference. Large-scale pouring is generally about 550 yuan per square meter. Beams or columns are calculated by meters, and the price of one meter is three or four hundred yuan.

Besides, the price of steel structure, the price of steel structure is generally calculated according to the square, because the steel structure is made of various steels, so what kind of steel is used determines the final price.

The construction of the steel structure is more flexible. It can be slotted on the wall and fixed by expansion bolts. The wall material is not allowed, and it can also be fixed by adding columns.

The larger the area of ​​the steel structure, the cheaper it is. Generally, the price per square is five or six hundred dollars. There will be another cost for the steel structure, that is, the bottom needs to be suspended, and each square also needs one or two hundred dollars. These two costs are added together to make the final cost of the steel structure.

Through this comparison, everyone can see that there is no cheaper way to do pouring and steel structure through price comparison, and which method to choose depends on your own needs.