It is very important to disclose the details of hydropower transformation. If there is a request, you must say it in advance, and don't 'pretend to have a tacit understanding'

thumbnail

Today, let’s talk about hydropower renovation. Recently, there was a hydropower construction site. During the construction process, I had different opinions with the owner. Although the matter is not big, it is quite enlightening.

Let me tell you about the problems in our hydropower. If there are owners who are changing hydropower or planning to decorate, you can find out in advance to see if your home also has such needs.

At present, there are two forms of hydropower reform, the first is full reform, and the second is bureau reform.

insert link

The complete renovation means that starting from the strong distribution box, all the wires in the house are replaced with new ones. This requires the distribution box to be replaced, the air switch to be replaced, and all the lines to be redesigned.

In this way, the amount of construction work is relatively large, and the cost of changing water and electricity is relatively high.

The second type is bureau modification, also known as breakpoint modification. The newly added sockets all lead to wires from the adjacent sockets, and the lines will be less, which is more cost-effective.

Our construction site is the bureau reform, and the problem also lies in the bureau reform.

When talking with the owner, I drew all the points needed by the owner on the wall. After the modification, the owner asked if there is a separate channel for the kitchen socket, and whether there is a separate channel for the air conditioner socket in the bedroom?

insert link

This made me ask questions all of a sudden, these two items are definitely not done, the house used to have no separate control of the refrigerator and air conditioner, and now I want to control it separately, the strong electric box is not enough, I need to replace it with a bigger one, and add more lines. This means that the corresponding switch should be added to the strong electric box.

We constructed according to the conventional idea of ​​bureau reform. The owner thought it was normal to add lines separately. Afterwards, we concluded that the problem was the lack of timely communication.

This is the matter, whether it is big or not, and it is not small. Through this matter, I would like to tell you that the conventional practice of hydropower conversion in different regions is different. When the hydropower reconstruction is completed, the communication between the two parties is very important. Be as detailed as possible. If you have a request, you should say it in advance. Don’t “pretend to have a tacit understanding”

insert link

The purpose of the water and electricity disclosure is to determine the location, and the second is to inform the construction party of your needs in time. Don’t have the idea that the construction party knows your requirements. Everyone’s requirements are different, and it is impossible for one set of construction to meet all requirements. owner