Answering the owner’s question today, the owner asked whether the bedroom door opening needs to be treated at the basic level? Some people tell him he needs it, and some people tell him he doesn’t need it. He doesn’t know what to do.

This question is easy to answer. Whether to do the grassroots or not depends on the requirements of the door.

If it is a conventional double-covered door, in this case, there is no need to deal with the base layer, just make the door opening as a standard, and smooth the walls on both sides of the door opening.

Making a regular door and making the base layer have the opposite effect. Normally, the door is reduced according to the size of the door opening. Making the base layer is equivalent to reducing the door opening by at least three centimeters, and the size of the door will be smaller. I believe this This is unacceptable to many owners.

The door opening is used as the base layer to make some special doors, such as single-covered doors, invisible doors, and doors made of stainless steel door sleeves.

There are strict requirements on the size of the door opening to make these doors. The basic purpose is to make the door opening into a standard rectangle, which will reduce the size of the door opening. For the special effect, many owners can accept it.

In addition to the door openings in the bedroom, there are also door openings in the bathroom and kitchen. These two door openings should also be paid special attention.

Before tiling tiles, you must decide whether you want to make a single-covered door or a double-covered door.

If you want to make a double-covered door, you don’t need to do any treatment on the three sides of the door, just like the bedroom door. If you want to make a single-covered door, the three sides of the door opening need to be tiled, and the inside tiles need to be touched with each other.

In short, the decoration is all kinds of meticulous work piled up together. The workers generally follow the conventional construction. If there are special needs, they must say it in advance. If you say it early, you can save money, but if you say it later, it will cost you money.